Contact Us:

SEND CLEAR

About

Learn More About the O-Tags® Product Line

Be the first to set a perfect monument

in under a minute without chipping or guess work

O-Tags® System

No O-Tags® System

50 SECONDS

5 MINUTES

Using O-Tags® System

California Monumentation Policy

Without O-TAGS® System

Without O-TAGS® System

Without O-TAGS® System

Without O-TAGS® System

High Accuracy at Record Time

As a third generation Land Surveyor, Licensed in the state of California, Teddy Ohana brings over 25 years of experience in the field to his products.

 

Conscientious and confident in his daily work, Teddy follows procedures that continue to uphold the integrity of the art of Land Surveying. For years, Teddy has been dissatisfied with the lack of products available in the market place that would install commonly used 3/4" Brass Tags recessed, cleanly and efficiently. Working primarily on multimillion dollar estates, Teddy was reluctant to leave behind chipped and damaged surfaces when setting monuments.

Convinced he could find a better way, Teddy developed O-TAGS® - an innovative tagging system that leaves a clean, long lasting and memorialized monument with little or no damage to the surrounding elements.

 

Be the first to set a perfect monument in under a minute without chipping or guess work.

The hole for the lead should be a minimum 3/4" deep and 1/2" diameter. The location should be slightly recessed to prevent the Tag from being scraped off. Care should be taken to prevent damage and fracturing to the concrete surface. Inspection staff prior to releasing the improvement performance bond may require replacement of damaged curb.